Walk the process. Verify how production actually works.

Use this checklist to review a manufacturing supplier's facility, materials, equipment, production controls, inspection, calibration, traceability, maintenance, capacity, documentation, and supply-chain practices.

Audit Review Progress
0/0

Progress is saved in this browser.

Follow material and information through the actual manufacturing flow.

The depth of an audit should reflect program risk. A simple commercial component may require less review than a critical, highly controlled, or technically demanding production program.

01

Facility & General Capability

Confirm that the facility and operating environment match the work being considered.

02

Receiving & Material Control

Review how incoming materials and components are identified and controlled.

03

Production Control

Observe how released requirements reach machines, operators, and workstations.

04

Inspection & Measurement

Verify the supplier can measure and document the requirements it agrees to manufacture.

05

Nonconforming Product

Review what happens when production does not meet requirements.

06

Maintenance & Tooling

Confirm that production assets can support repeatable operation over time.

07

Capacity & Scheduling

Verify that available capacity supports forecast demand, not only the first order.

08

Subsuppliers & Supply Continuity

Understand which parts of the manufacturing chain exist outside the audited facility.

After the Audit

Document evidence, gaps, owners, and follow-up actions.

Record objective observations

Separate direct observations and records from assumptions or impressions.

Identify program-specific gaps

A supplier can have a strong general system while still lacking one capability required by the specific project.

Assign corrective actions

Define the issue, responsible party, expected evidence, and timing before approval where necessary.

Define the approved scope

Supplier approval can be limited to particular processes, materials, facilities, product types, or production conditions.

Revisit meaningful changes

New equipment, ownership, facility moves, major quality issues, capacity changes, or new processes may justify future review.

An audit is one part of supplier qualification.

Combine facility evidence with technical capability, quality systems, commercial fit, capacity, communication, samples, and production performance.