Before release, verify the manufacturing system.
Use this checklist to review whether the design, material, supplier, tooling, quality plan, documentation, capacity, packaging, and launch plan are ready for recurring production.
Nothing checked yet. Progress is saved in this browser.
Product Definition
Confirm the released technical package represents the intended production product.
Materials & Purchased Components
Verify that production inputs are defined, available, and controlled.
Manufacturing Process
Confirm the intended production route has been defined and tested.
Inspection & Quality
Verify how product conformity will be measured and documented.
Supplier Readiness
Confirm that the supplier can support the required quantity and production conditions.
Launch & Delivery
Confirm the operational details needed to release production.
Use readiness review before production problems become recurring production problems.
For programs still moving through prototype and pilot quantities, review the complete transition from design validation to production release.
Prototype to Production →